Glen Arbor Bridge Pipeline Replacement Project

Glen Arbor Bridge Pipeline

This project has been completed.

The District water main inside Glen Arbor Road was both undersized and leaking. Additionally, the pipe was inaccessible and maintenance could not be performed. This project included the design and construction of an 8-inch ductile iron water main to extend beneath the Glen Arbor Bridge. In addition to being larger than the current pipe, the new pipe was designed to be easily observed and repaired when needed. 

Project Cost: $350,000

Start Date: March 2022

Completion Date: October 2022

Pipe beneath Glen Arbor Bridge