Redwood Park Pipeline Replacement Project

Pipeline installation at Redwood Park
Pipeline Installation

This project has been completed.

  • Cost: $547,601
  • Funding Source: Loan
  • Start Date: May 2023
  • Completion Date: June 2023 (Final paving completed September 2023)
  • Location: Ben Lomond
  • Key elements:
    • Larger, upgraded pipeline

Map of the Redwood Park Tank project

Description: The Redwood Park Pipeline Replacement Project included the installation of a new 8-inch water main. The new 1,260-foot pipeline, made of high-strength, long-lasting iron, replaced an existing 2-inch water main. The upgraded pipeline supports increased fire flow and water pressure at existing hydrants, which will improve vital resources for firefighters. This project was completed in preparation for the replacement of a leaking redwood tank with a new bolted steel tank.