Bid Opportunities
The District maintains a list of potential bidders for Professional Consulting Firms and for Construction Firms. Individuals or Firms desiring to be included on this list should complete the Bidder List Application found at the link to the left. The District will notify all firms on the list of all new RFP/RFQ and all new Amendments to existing RFP/RFQ as they become available.
Governor Gavin Newsom - Executive Order 3-4-2022
Requests for Proposals (RFP)/Qualifications (RFQ):
Current:
(Pending Updated RFP Release) FEASIBILITY ANALYSIS FOR UTILIZATION OF SAN LORENZO VALLEY WATER DISTRICT’S (SLVWD) LOCH LOMOND RESERVOIR SOURCE
- Feasibility Analysis for Utilization of the SLVWD's Loch Lomond Reservoir Source RFP
- Addendum No. 1 (10/9/23)
- Addendum No. 1 (10/9/23)
Recently Closed:
LOCAL HAZARD MITIGATION PLAN
PEAVINE PIPELINE REPLACEMENT ENVIRONMENTAL RECOMMENDATIONS, REVIEW AND PERMITTING
2023 COMPENSATION STUDY REPORT
Public Assistance and Disaster Recovery Management Services
Water Year 2023-2025 Ecological and Operational Streamflow Monitoring
District Manager Recruitment
Foreman
- Foreman Pressure Break- RFP
- Foreman Pressure Break - Structure
- Foreman Pressure Break - Sandis Proposal
- Foreman Pressure Break - Freyer & Laureta Proposal
2023 Rate Study
- 2023 Rate Study RFP
- Attachments
- Maps of District Service Area
- M. Cubed Water & Sewer Service Affordability Assessment (SLVWD information begins on page 34)
- 2016 Cost-of-Service Study
- 2017 Rate & Connection Fee Study Report
- 2021 Water Master Plan
- 2021 Capital Improvement Plan
- 2022 Groundwater Sustainability Plan of the Santa Margarita Groundwater Agency
Water Year 2023-2025 Ecological and Operational Streamflow Monitoring
Fire/Vegetation Management Maintenance
Redwood Park Pipeline Replacement
- Redwood Park Pipeline Replacement RFP Vol I
- Redwood Park Pipeline Replacement RFP Vol II
- Redwood Park Pipeline Replacement Plans
- Redwood Park Pipeline RFP Addendum No. 1
- Redwood Park Pipeline Pre-Bid Meeting Attendance
- Redwood Park Pipeline Bid Opening Summary
Lyon & Big Steel Zone Pipeline Improvements
- Lyon Pipeline RFP Vol I
- Lyon Pipeline RFP Vol II
- Lyon Pipeline Engineer's Estimate
- Lyon Pipeline Plan Set
- Lyon Pipeline Pre Bid Attendance
- Lyon / Big Steel Zone Pipeline Improvements RFP Addendum No.1 rev.1
- Lyon / Big Steel Zone Pipeline Improvements RFP Addendum No. 2
- Lyon / Big Steel Zone Pipeline Improvements RFP Addendum No. 3
- Lyon / Big Steel Bid Summary
- Anderson Pacific Lyon / Big Steel Bid
- Granite Rock Lyon / Big Steel Bid
- Monterey Peninsula Lyon / Big Steel Bid
RE-BID Fall Creek Fish Ladder Rehabilitation
- Fall Creek Fish Ladder Construction RFP Vol I with Tech Specs.
- Fall Creek Fish Ladder Construction RFP Vol II
- Fall Creek Fish Ladder Construction RFP Addendum No.1 - Reschedule of Pre-Bid
- Fall Creek Fish Ladder Construction RFP Addendum No. 2
- Fall Creek Fish Ladder Construction RFP Addendum No. 3
- Fall Creek Fish Ladder Pre-Bid Attendance
- Fall Creek Fish Ladder Plan Set
- Fall Creek Fish Ladder Cost Estimate
- Fall Creek Fish Ladder County Permit
- Fall Creek Fish Ladder LSA Agreement
- Fall Creek Fish Ladder Water Quality Certification
- Fall Creek Fish Ladder Riparian Execption
- Syblon Reid Bid
- McGuire Hester Bid
Environmental Services Related to the Felton Heights Tank Replacement Project
Re-Bid Foreman Pipeline Access Trail Rehabilitation Project
- Foreman Access Trail Bidding Results
- Foreman Trail RFP Vol. I
- Foreman Trail RFP Vol. II
- Foreman Access Trail Rehabilitation Re-Bid RFP Addendum
- Design Drawings - Foreman Trail Draft Bid Set
- Engineers Opinion of Probable Cost
- Foreman Intake Final GeoTech Report
Environmental Services Related to the Consolidation of Braken Brae and Forest Springs
On-going & On-call Outreach Consulting Services
2021 CIP Pipeline Project
- Bid Summary
- RFP Vol I rev. 2022-06-22
- RFP Vol II
- Technical Specifications
- Plan Set
- Cost Estimate
- Pre Bid Attendees
- Addendum No. 1
- Addendum No. 2
- Addendum No. 3
- Addendum No. 4
Design Related to Consolidation of Braken Brae and Forest Springs
Braken Brae and Forest Springs Bid Results
Alta Via Construction Management
Alta Via Pipeline Replacement Project
- Alta Via Pipeline Replacement Vol 1
- Alta Via Pipeline Replacement Vol 2
- Alta Via Utility Plan
- Alta Via Pipeline Connection Geotechnical Evaluation Report
- Alta Via Pipeline Replacement NOE
- Alta Via Construction - Bid Summary
Historic Bid Opportunity Documents
Construction Management Glen Arbor Bridge Main Replacement
Construction RFP for Glen Arbor Bridge Main Replacement
- RFP Volume I of II
- RFP Volume II of II
- Notice of Exemption
- Plan Set
- Caltrans Encroachment Permit (0661 0521 NUT Permit)
Quail Hollow
- Quail Hollow Pipeline Replacement (Plan Set)
- QH Pipeline Volume I (Contract Docs and Tech Specs)
- QH Pipeline Volume 2 (Bidding Docs)
CIP Project
FEMA Project
Fuel & Vegetation Reduction
CA-9 Bridge Water Line Relocation Design
5 - Mile Pipeline Constructability
Foreman
Lyon
Riverside Grove
Cross Country Pipeline - 5 Mile
Little Lyon
Administrative/Environmental
- Grant Writing and Research - Due March 5, 2021
- Environmental Services - Lyon Tank Access Road Rehabilitation Project
- Audit Firm RFP - For FY20-21 - Due January 13, 2021
- Construction Management Services – 2020 Pipeline Replacement Project
- Environmental Services - 2020 URBAN WATER MANAGEMENT PLAN for SAN LORENZO VALLEY WATER DISTRICT AND SCOTTS VALLEY WATER DISTRICT
** DISCLAIMER REGARDING BID DOCUMENTS **
District quote/bid documents are provided electronically and free of charge. It is the responsibility of each prospective bidder to verify the completeness of their printed bid documents before submitting their bid and accompanying executed addenda acknowledgement forms. Users are cautioned that the San Lorenzo Valley Water District does not assume any liability or responsibility based on any defective or incomplete copying, scanning, excerpting, faxing, downloading, or printing of the contract documents.
Be advised that the information contained on this website may change and without notice to prospective bidders. It is the responsibility of each prospective bidder to check this website on a daily basis through the close of bids for any applicable addenda or updates. Amended Quote/Bid/RFP submissions received without acknowledgement of the applicable amendment are not acceptable.
We are committed to providing an equal opportunity for all business enterprises to participate in our purchasing and contracting activities.
Materials and Equipment:
- Inventory - District inventory orders are routinely placed 1-2x per month. Interested vendors should fill out a vendor interest form to have the inventory bid sheet sent directly to them. Click here for Vendor Interest Form.
Purchasing Department Bid Opportunities
- There are currently no active bid opportunities.