5-mile Constructability Study

5-mile

The CZU fire resulted in extensive damage to the San Lorenzo River watershed with significant impacts to the San Lorenzo Valley Water District’s (District’s) facilities including the Peavine and 5-Mile Pipeline, which were high density polyethylene (HDPE) pipe laid at grade along man-made bench throughout the watershed. The Peavine and 5-Mile segments must be reconstructed to restore the critical surface water supply for the SLVWD system. The Cross Country Pipeline Constructability Study (Study) will focus on restoring the raw water conveyance system that serves the SLVWD system.

Read the full report HERE.